§ 4.1.6. Construction contractors.Storage of materials not within a building or structure shall be screened by a permanent fence, wall, or approved planted buffer. Such screen shall be at least six feet in height or two feet higher than stored materials, whichever is higher. Such screen shall also be in conformance with buffer standards in Article 6—"Site Design Standards."